Is Stormwater the Canary in the Coal Mine?

Is Stormwater the Canary in the Coal Mine?

Editor's Note: Articles written by citizens reflect their own opinions and not the views of the Winter Park Voice.  

Guest Columnist Charley Williams

If ever a project needed to hit the “pause button” this one is it—staring us right in the face.

The stormwater component, as outlined in this piece, is the red flag alert.
The designated stormwater basin (of which Lake Mendsen is the receiving end) is already at capacity (Saint Johns River Water Management District). It already serves the Paseo, Winter Park Village, runoff from US 17-92 and 74 more acres. We all know the site at Morse and Denning/Harper floods–badly. Yes, we will experience future rain/storm events. Count on it. Also of note, current conditions offer an irony: Lake Killarney sits higher than Mendsen. That’s a problem. What’s more, Lake Rose, which sits at the other end of MLK Jr Park, is being proposed as the overflow-reliever. Lake Rose is a sinkhole. Lake Rose is not wholly owned by the city. In order for the city to solve the stormwater conundrum, it will need to purchase property it currently does not control. Citizens will lose yet more park greenspace if either lake needs to be enlarged. Is that fair? We are already looking at over 8% of the original park footprint being diverted to development. And now we are increasing that number? Yes!

Which brings me to this wish list: (the good news: it’s not too late, if there is political will)

1. Save the trees on the northwest corner of the library property: Right now, up to 63 trees are slated to be lost. After all, this was a park first. Is the rebranding of the project to “Canopy” an outright taunt?

2. Reclaim the lost square footage chopped out of the library project. The proposal adds only 600 square feet over our current library, with no café, no bookstore. That’s not what the citizens’ were promised—we were promised 50,000 square feet. Get it back. Function over form. Why are we short-changing future generations? Winter Park will continue to grow. Plan for it! We are paying architects $2 million to solve that problem. Have they?

3. Work harder to integrate the structures with the Park experience. Current designs operate as if on two parallel universes. The buildings ignore the park. How can that be? The park is an outright gift—embrace it.

4. Parking: we were promised a garage. Where is it? Priority: Convenience (and safety) for our seniors.

5. Green building standards: where is the solar component? This is Florida!

6. Finally—work to acquire the private holdings along Fairbanks that abut MLK Park. Add these parcels to the masterplan park acreage. The prior CRA made this a priority. (Loss of the Bowling Alley was monumental). Yes, this might just compensate for the loss of park space

In the NW corner of MLK Jr Park: fair is fair.

To comment or read comments from others, click here →

WP Sinkhole Back in the News

WP Sinkhole Back in the News

Winter Park’s infamous 1981 sinkhole is gobbling up attention in the latest debate over the city’s planned library and civic center.

City commissioners Monday will decide if they share an advisory board’s concerns that the sinkhole – now called Lake Rose – will have to play a major role in handling stormwater from the site.

Stormwater retention was one of two major issues that gave the planning and zoning board pause last week in considering the proposed library plan. Parking was the board’s other stumbling block.

City staff asked the advisory board to make a final decision about the complete site plan, but the board gave it only preliminary approval and added two conditions. First, it wanted more detailed information about the stormwater plan once the St. Johns River Water Management District approves it, a process that could take another three weeks. Second, it wanted city commissioners to explore finding 36 more parking spaces, a move that could result in the demolition of the Lake Island Hall recreation building.

No matter how the advisory board voted, city staff said later in the meeting, the city commission this Monday could override that recommendation and give the project final approval.

At the heart of the board’s concerns is the city’s plan to run a pipeline from Lake Mendsen, which would be next to the new buildings, to Lake Rose. The idea is to allow excess water from the larger lake to drain into Lake Rose during hurricanes and heavy rains.

Board member Bob Hahn pushed for the planning board’s two conditions, saying he needed to see additional study of the water management issue to make sure the idea would work. “I’m comfortable with moving the project through in the preliminary stage, but having it come back [to us} in the final stage.”

Like other board members, he expressed support for the new library but was concerned that unanswered questions remained.

“I, too, feel we’re going too fast,” Chairman Ross Johnston said. “There’s a lot that has been predetermined, much more than is normal for a planning and zoning meeting,”
Public Works Director Troy Attaway said the pipeline would let the two lakes “function together as basically one lake” and increase its capacity to handle storm water. Attaway predicted that the connection also would help alleviate historical flooding along Denning Drive during rain storms.

Lake Rose is named after Mae Rose Williams, whose house fell into the sinkhole in May of 1981. Her heirs still own a portion of the property, as do the city and another property owner. Cheryl Thompson, her granddaughter, objected to the city’s stormwater plan during public comment, citing existing overflow problems. Resident Kim Allen wrote the city that the pipeline may not relieve Lake Mendsen’s current lack of room for stormwater. The city also should be concerned about flushing polluted stormwater down drain wells into the aquifer, she said.

Other residents noted that the plan does not comply with the language of the $30 million bond referendum, which called for a parking garage. City code requires 146 parking spaces for buildings the size of the proposed library and civic center. The city would provide 213 spaces in parking lots, plus 24 parallel parking spots on Harper Street. City Planning Manager Jeff Briggs said the city is looking into tearing down the recreation building at Lake Island to add even more parking places, but no decision has been made. The building is “not well utilized,” he said.

The project will change the look of the park in many ways. In addition to the two new modern structures that will house the library and civic center, the site will lose 63 protected trees, including most of the live oaks on the property. In the mid-1900s, the site was a mucky wetland that gradually was filled in around the edges with construction debris.

To comment or read comments from others, click here →

Stewardship: In Support of a Land Ethic

Stewardship: In Support of a Land Ethic

Editor's Note: Articles written by citizens reflect their own opinions and not the views of the Winter Park Voice.  

Guest Columnist Charley Williams

“The earth is common ground and…gradually the idea is taking form that the land must be held in safekeeping….” E.B. White, 1942

There is growing support state-wide and throughout our local communities for the adoption of a formal land ethic.

Why?

Each of us has become witness to challenges never before seen in the Sunshine State. Our beaches and shores are blighted with sea-rise and algae bloom. Climate change spin-offs have brought us increasingly violent storms like Irma. The storms, combined with pollution and over-building, are shortening the life cycle of our tree canopy, which is the critical factor in cleaning the air and protecting us from the sun.

Parks are on Life Support

City and county park lands are vying for survival with the exponential growth now occurring in Central Florida. Cities and counties do their best to balance competing demands for passive vs active use of park lands.

Still Not Safe to Get Out of the Car

Central Florida continues to head the list of the most dangerous communities for pedestrian and bicycle safety. Here in Winter Park, greenspace connectivity is increasingly cited as the single most important step to renewing our pledge to sustain the character of our community.

Green Assets = $$$

While open green lands cannot be measured solely in economic terms, parks and green space are invaluable assets as a marketing tool for our city. Proximity to parks has been proven to increase property values. What’s more, protected park lands do not require costly, full-blown municipal services such as water, sewer and schools.

Momentum is Building

This conversation has been gaining momentum since 2014, when Amendment 1 — known as the Florida Water and land Conservation Initiative — to increase spending for natural lands acquisition programs like Florida Forever passed with an overwhelming majority.

WP Needs an Integrated Plan

Locally, this vision for an integrated plan for greenspace connectivity within our urban core resonates with citizens of all walks of life. It embraces our often-discussed concerns for a healthy tree canopy, a vibrant, connected system of parks and greenspace, an appreciation for scenic beauty, designated quiet zones, family enjoyment, outdoor recreation, community enrichment and sustainable local native habitats.

City Leadership: Join In

I would urge our city and community leaders to take this trend a step further. The time has come to clearly define and articulate a Land Ethic for all of Winter Park. It will serve as our guide for future decisions as well as the definition of our responsibility for this generation and the next. It’s time to stop talking and pledge to take action.

To comment or read comments from others, click here →

Contribute

We Depend on your support, make
a tax-deductible donation here.

Mission

The Winter Park Voice is a trusted nonprofit journalism site that covers our City Hall and beyond. We endeavor to engage, inform and connect citizens on all sides of issues affecting the quality of life in Winter Park.

Follow Us

Follows
Share This