Adjaye to Reveal Library Design Concept

Adjaye to Reveal Library Design Concept

Nov. 1 at the Rachel Murrah Civic Center

Architect Sir David Adjaye will present his long awaited conceptual design of the new Winter Park Library & Event Center.

Wednesday, Nov 1, 5:30 to 7:30 pm
Rachel D. Murrah Civic Center
1050 W. Morse Blvd.

The event will be a special meeting of the Winter Park City Commission. Mayor Steve Leary will open the meeting and introduce members of the library-event center design team, which will feature lead architect Sir David Adjaye. Public input will follow the formal presentations.

Library-Event Center Design Team

The design team assembled for this project are Pizzuti Solutions, the Owner’s Representative that will work with City staff to manage the project, budget and schedule; HuntonBrady Architects, which will develop the signature architectural design in partnership with Adjaye Associates; and the construction management team, which will consist of Brasfield & Gorrie and Lamm & Company.

Sir David Adjaye

Sir David Adjaye was knighted by Queen Elizabeth II and named one of 2017’s 100 most influential people by TIME magazine. His firm is known for its innovative approach to library design. Adjaye’s projects include the award-winning Idea Stores in the London Borough of Tower Hamlets and the Smithsonian Institution’s National Museum of African-American History & Culture, which opened September 2016 in Washington, D.C.

Listen to Live Broadcast

Those unable to attend can watch the presentation broadcast live on the following outlets.
cityofwinterpark.org/facebook
cityofwinterpark.org/#nextchapterwp
Orange TV Channels:

Spectrum (formerly BrightHouse) Channel 488
Comcast® – Channel 9
CenturyLink® – Channel 1081 (HD) Channel 81 (SD)
WSWF (digital over the air) Channel 10 – 2

To comment or read comments from others, click here →

Young Composers Return to DPAC

Young Composers Return to DPAC

UCF, Orlando Phil Present 2017 National Young Composers Challenge

Mark the date: Sunday, November 12, 1:00 to 5:00 pm, in the Walt Disney Theater at the Dr. Phillips Center for the Performing Arts. Experience an unforgettable musical afternoon as the University of Central Florida, the Orlando Philharmonic Orchestra and the National Young Composers Challenge (NYCC) join to present the 2017 Composium.

Bring the Family

Professional musicians from the Orlando Philharmonic Orchestra and the UCF faculty will perform classical compositions written by six young musicians aged 13 to 18. Dress is casual. Children are welcome. Admission is free. More information is available at http://www.youngcomposerschallenge.org.

Part Concert, Part Seminar

The Composium is part concert, part rehearsal, part recording session and part seminar. Winning compositions, chosen from thousands submitted by teen composers from around the world, are rehearsed, discussed and recorded before a live audience.

Founded in 2005, the NYCC is a non-profit charitable organization whose goal is to promote the creation of new orchestral music and foster the careers of the next generation of American composers. The purpose of the Composium is to build greater understanding of and support for symphony orchestras and the creation of new orchestral music.

‘You Will Never Again Hear an Orchestra in Quite the Same Way’

“The level of sophistication of these orchestral works is mind-blowing,” said Steve Goldman, Executive Director of the NYCC. “This is a rare chance to witness new orchestral works by America’s top young composers performed for the first time by the Orlando Philharmonic Orchestra.”

“Once you have attended a Composium,” said Goldman, “you will never listen to an orchestra performance in quite the same way again.”

‘Central Florida’s Commitment to Classical Music’

Dean Jeff Moore, of the UCF College of Arts and Humanities, said this event is good for the young composers, but also the Orlando community. “UCF is committed to providing access for people to pursue their passions,” said Moore. “The longtime partnership between UCF, the Orlando Philharmonic and now the NYCC demonstrates Central Florida’s commitment to the past, present, and future of classical music.”

‘Support for Young Composers is Essential to the Future of Music’

“The Orlando Philharmonic Orchestra is proud to partner with UCF and the National Young Composers Challenge,” said Executive Director Christopher Barton. “This opportunity to support the development of our next generation of composers is both exciting for our audiences and essential to the future of music.”

National Young Composers Challenge is a 501(c)3 non-profit charitable organization supported by grants and in-kind donations from the University of Central Florida, Rollins College, Full Sail University, Timucua Arts Foundation and the Goldman Charitable Foundation. http://www.youngcomposerschallenge.org

To comment or read comments from others, click here →

Villa Tuscany Memory Care

Villa Tuscany Memory Care

‘Forget It,’ Says Commission

At their October 9 meeting, Commissioners once again denied Villa Tuscany’s application for conditional use for a 31,000 square foot memory care facility at 1298 Howell Branch Road with a decisive 5 – 0 vote.

Villa Tuscany Revises Application for Conditional Use

In March 2017, after the Commission denied their application for a somewhat larger memory care facility, Villa Tuscany sued the City in an attempt to reverse the decision. The developer and the City entered into a mediated settlement process, overseen by a Special Magistrate. City Manager Randy Knight led the negotiations for the City. The result was the revised application for conditional use and variances presented October 9.

Applicant Still Seeks Variances

City Planning Manager Jeff Briggs explained in his presentation to the Commission that the developer had made three basic changes. The building was reduced from three stories to two stories, although the overall height of the building was dropped by only four feet, from 35 feet to 31 feet. The planned facility would accommodate 49 beds instead of the original 51 beds.

Second, the parking lot was moved from a 25-foot setback from Lake Temple to the 50-foot setback specified by City Code.

Third, the building was shifted eastward on the property to protect the view of the neighbors across Lake Temple. The shift in location put the building to within 15 feet of the sinkhole on the property. Code requires a 50-foot setback from any wetlands, so approval would involve a setback variance of 35 feet.

No Commission Guidance for Staff During Negotiations

“This mediated settlement process is certainly interesting from the staff’s perspective,” observed Briggs. Staffers who engaged in the negotiations were advised by City Attorney Kurt Ardaman that they were not allowed to speak with Commissioners about the project while the negotiations were underway.

“We had to base our decisions based on comments we heard from some of you at that March public hearing,” said Briggs, “and we had to kind of guess, to be perfectly honest.”

Briggs said he thought the reduction in number of stories and increased setback from Lake Temple might be sufficient for a staff recommendation of approval, but deferred to the Commissioners.

Well-Organized Community Opposition

The applicant then presented their case, followed by a brief Commission discussion, which consisted chiefly of Commissioner Sarah Sprinkel’s motion to deny and Commissioner Carolyn Cooper’s second.

Residents of the neighborhood, led by spokespersons Barry Render and Nancy Freeman, opposed the project on grounds that the structure is incompatible with the surroundings and is simply too large.

They acknowledged that while there are commercial buildings to the north and east of the property, those buildings are around 3,000 square feet – one-tenth the size of the proposed memory care structure. In fact, Freeman pointed out, the proposed Villa Tuscany project is larger than City Hall.

Freeman and Render said the neighbors did not object to the purpose of the project. They cited the example of Alabama Oaks, another memory care facility in Winter Park that is owned by the same applicant. Alabama Oaks is a series of small cottages that house the residents and staff of the facility, one which the neighbors feel would be suitable in their neighborhood.

Drone Photos Show Flooding at the Site

The citizens’ presentation included drone photographs taken several weeks after Hurricane Irma hit this area September 10. Photographs show the proposed building site would still have been under water as of the October 9 meeting. One can assume the additional impervious surface of a large building and 25-space parking lot would cause the water level to rise further.

Dr. Render concluded the neighbors’ presentation with a request. “We would like a project that is proportionate in size and scale, is compatible with our neighborhood, one that would preserve the charm and beauty of north Winter Park and one that would require zero variances.”

Thumbs Down 5 – 0

At the end of the day, the Commissioners unanimously denied both the application for conditional use and the Mediated Settlement Agreement.

The applicant still has the opportunity to seek relief in the court system.

To comment or read comments from others, click here →

No Park Expansion

No Park Expansion

A 20,000-square-foot medical office building will occupy a lot once home to bowling lanes on Fairbanks Avenue near U.S. Highway 17/92.

City commissioners accepted an offer to buy the land from ComTech Properties for $3.5 million by a 4-1 vote, Commissioner Carolyn Cooper opposed. The site at 1111 W. Fairbanks Ave. has been coveted by some in Winter Park eager to expand Martin Luther King Park.

The city put the land out for bid in June, less than a year and a half after it bought the 1.63 acres from Rollins College for $2.9 million. The college had bought the bowling lanes site in 2013 for $2.85 million as part of a planned athletic field, but sold it to the city after it found another location.

The city used community redevelopment — or CRA — funds from its special downtown taxing district to pay for about a third of the purchase price to Rollins. The intent was to create turn lanes from Fairbanks Avenue onto Hwy. 17/92. There also was discussion at the CRA and city commission level about using the parcel to expand MLK Park.

Commissioner Cooper argued Monday the city should delay the sale “for now,” so it can study what effect the new city library will have on storm water drainage in the area. Hurricane Irma raised the need for more land to offset storm water, she said. Commissioner Greg Seidel voiced similar concerns, as did two residents who spoke to delay the sale. This area “was the TV stand-up spot” reporters used to show flooding from Irma, resident Charley Williams said.

Mayor Steve Leary said the agenda item was “never about park space and water,” but about needing space for traffic lanes. Arguments about stormwater were just another tactic to delay the sale, he said, and that could scare away prospective tenants in the office building and jeopardize the bid.

To comment or read comments from others, click here →

Power and Police Priorities

Power and Police Priorities

Winter Park’s electric utility and law enforcement emerged as partial winners in Winter Park’s budget debates. The city’s tax rate for 2018 will stay the same.

In the wake of Hurricane Irma and complaints about outages, city commissioners figured out ways to make more money available to the electric utility fund. The biggest chunk — $1 million – will be transferred to the utility this budget year from the city’s water reserves. Another $425,000 would be freed up in the utility’s 2018 contingency funding by moving street-lighting from the utility to the general fund, where it had been in the past.

Not yet known is whether that the additional $1.425 million will speed up the city’s underground wiring or how much work could be accomplished. Although several commissioners said the money was intended to move forward with undergrounding, Mayor Steve Leary said some of the $1 million could go toward other improvements necessitated by the hurricane. City Manager Randy Knight estimated the city’s total storm-related costs at $5.5 million with much of that ultimately covered by the Federal Emergency Management Agency, or FEMA.

“The City has undergrounded just over six miles with the $3.5 million provided for the FY17 fiscal year,” said Clarissa Howard, the city’s communications director Tuesday. “It is extremely difficult to determine how much could be done with additional funds as each project is different and complexity can affect the cost.”

Commissioner Carolyn Cooper voted against the $1 million transfer, saying she preferred such fund-to-fund shifts be done as loans that are paid back. Both Mayor Leary and Commissioner Pete Weldon voted against putting street lighting back in the general fund.

NO BODY CAMERAS FOR POLICE

Police Chief Michael Deal was successful in winning an $862,000 increase in his department’s budget. In earlier budget talks, Mayor Leary had asked the department to cut its request by $200,000, but on Monday commissioners decided to approve the full request. They said they wanted the department to be competitive with other Central Florida departments in hiring new officers.

Commissioners, however, declined to budget the $120,000 Deal had sought for police body cameras. In earlier budget talks, only Mayor Leary had supported that request. Commissioner Weldon didn’t want the cameras to be used to make public safety a “political football,” and Chief Deal said he had seen no complaints of excessive force or racial profiling in the year he has been chief.

On Monday, Commissioner Sarah Sprinkel noted the police department’s healthy budget and said the chief could use the money for body cameras if he saw them as a priority. If the chief “can figure out a way to do it, fine,” she said.

NO TAX RATE INCREASE

Commissioner Weldon was unsuccessful in seeking a cut in the property tax rate to 3.9942 mills. That would have removed a half million dollars from the general fund. One mill equals $1 of tax for every $1,000 in assessed property value.

Weldon argued that the city’s coffers are healthy enough to sustain a lower rate. In addition, he said, the same millage will bring in more revenue because the city’s assessed property values have increased. Commissioners voted 4-1 to keep the rate at 4.0923 mills.

To comment or read comments from others, click here →

Stormy Weather Ahead

Stormy Weather Ahead

Will the Lights Stay On?

Editor's Note: Articles written by citizens reflect their own opinions and not the views of the Winter Park Voice.  

Peter K. Gottfried, Guest Columnist

Tropical Storm Maria has now become Hurricane Maria and is battering residents of the Caribbean — even as they are still reeling from the devastation of Hurricane Irma. Too soon to tell if Maria will turn toward Central Florida, but one thing remains certain – the City of Winter Park is still not ready for a major hurricane.

This rotten utility pole at Stovin and Park Avenue fell during Hurricane Irma.

Storm Water Has No Where to Go . . .

Flooding occurs in the same areas of the City it always has – and thanks to continuing development without proper storm water management, it is getting worse. The City knowns about these areas, but continues to take a go-slow approach to addressing them.

. . . Except Into the Roads

Lake Mendsen within Martin Luther King Park – site of the proposed $30 million library-event center — is woefully inadequate to handle existing storm water drainage from the Winter Park Village, the Paseo Apartments and the CNL Heritage Center. Even a heavy afternoon thunder storm will cause flooding on Denning Drive and Harper Street. The construction of the new library, with its associated impervious surfaces, can only make things worse. Other areas of the City that routinely flood include the intersection of Kings Way and Fawsett Road and stretches of Palmer Avenue, where water rises to the curb top after an afternoon downpour.

High Rates Alone Won’t Keep the Lights On

Reliable electric power during major storms is a significant issue. Like many other customers in Winter Park, I was without power for a week following Hurricane Irma.

Let’s Bring Our Infrastructure Into the 21st Century

Winter Park purchased the electric utility from Progress Energy/Florida Power in 2005 with a promise to underground all lines within 10 years. According to the City website, that target completion date has moved out to 2026. Progress is measured in terms of how many miles of line have been undergrounded rather than the number of additional customers served. The current debate is less about how and when to underground and more about how to pay for it. For information about undergrounding in your area, go to https://gispublic.cityofwinterpark.org/ugstatus/

Editor’s Note: The City of Winter Park issued a statement that said undergrounding timeline was 20 years.

Winter Park can do better. There is no reason we should scramble every time there is a major storm. Let’s bring our infrastructure up to date so we can have some peace of mind when the next storm hits.

Peter K. Gottfried is President of Natural Systems Analysts, Inc. which provides technical and scientific support to the U.S. Geological Survey, the U.S. Coast Guard, and the Bureau of Land Management. He served as a City Commissioner and on the Planning and Zoning Board, Lakes and Waterways Board and, currently, on the board of Mead Botanical Garden.

To comment or read comments from others, click here →